Booths built from modular kit we own and redeploy show after show, rather than fabricated once and skipped. On CBRE's ICSC programme that took the footprint from 39,912 kg CO2e in 2023 to 12,613 kg in 2025, and the cost came down with it.
Designers in the same building as the workshop, the modular stock and the production team, so a design gets tested against what can actually be made before it reaches you. 2,866 square feet in Feltham on on-site solar. The only thing we do not do in-house is print.
Every factor carries a named source and a date, cited on the report. Materials by weight, freight by mode, crew travel, hotel nights, screen energy and end of life. We publish the emission factors we use, which nobody else in this sector does.
Measurement and gap analysis led by a Chartered Environmentalist. We state which emissions are inside the boundary and why, and publish the wider figure alongside so the choice is visible. On one assessment that was the difference between 1,604 tonnes and 51.
Activations, conferences, internal events and festival retail, built on reuse and run without drama. Red Bull Drift Pursuit used 52 kg of new material for the entire event. Good project management from the start should mean no extras invoiced.
Airport and duty free fixtures, pop-ups and merchandising guidelines. We built the life cycle analysis tool used across a global travel retail estate: 681 projects, a 51 percent reduction, more than 411 tonnes of CO2e avoided.
Where we work
UK and European projects are produced in our own workshop by our own people. Everywhere else we deliver through more than 120 partners across 27 cities and four continents, each interviewed and checked against our own supplier requirements.
Who we work with
CBRE, Pernod Ricard, Burberry, Red Bull, Bloomberg, Port of Dover, Hurtigruten and The Co-op. Thirty-one projects with the method written down are in our case studies, and our credentials are on the about page.
Figures are indicative, produced with our own in-house methodology and not independently audited. Third-party verification can be arranged on any project.